Home
About Us
  • Our Mission
  • Our People
Services
Projects
Contact Us
Employment
Lo Sardo General Contractors, Inc.
Home
About Us
  • Our Mission
  • Our People
Services
Projects
Contact Us
Employment
More
  • Home
  • About Us
    • Our Mission
    • Our People
  • Services
  • Projects
  • Contact Us
  • Employment
Lo Sardo General Contractors, Inc.
  • Home
  • About Us
    • Our Mission
    • Our People
  • Services
  • Projects
  • Contact Us
  • Employment

EMPLOYMENT

PROJECT ENGINEER

Responsible for overall project delivery (cost, schedule, quality, contracts) on multiple projects; Prepare and modify proposals, shop drawings, submittals and RFI’s; Ensure conformance to engineering plans, specifications, construction standards; Prepare Status reports and payment documents by collecting and analyzing construction activity; Monitor and track project milestones, deliverables and proactively assess and identify solutions.  

Must have knowledge of Construction Cost Estimating, Risk Analysis, Construction Accounting and Finance, Foundation Engineering, Building & Town Planning and Repairs & Rehabilitation of Concrete Structures. 

Master’s Degree Civil Engineering, or Construction Management Plus 40-hour Site Safety Training certification and CMIT Certification are required.  

Salary: $126,797.00 

Please apply with two copies of resume. 

LoSardo General Constructors Inc., 

35 Crescent Street 

Brooklyn, NY 11208 


Posted 8/22/23


    George Westinghouse High School

    Lucy G. Moses Preservation Award in 2019

    This facility consists of a four-story building built in 1908 and a three-story 1963 addition, together housing three schools. Lo Sardo General Contractors performed exterior restoration including replacement of the roof systems and entire parapet on the original building, with replacement in kind of all terra cotta tracery and copings; removal of the parapet at the southeast and southwest corners of the 1963 addition; and replacement of brick masonry, granite replacement and injection waterproofing at various locations. The Guastavino-tiled vault ceiling over the former main entrance is part of the restoration program. The project was awarded a Lucy G. Moses Preservation Award in 2019 by the New York Landmarks Conservancy.

      Wave Hill Restoration

      ADA Accessibility and Infrastructure

      Exterior Restoration & Interior: Elevator/ADA, Structural Reinforcing, Restoration Armor Hall,  Systems Upgrade, Café, Servery,  Kitchen, Kerlin Learning Center & Theater

      Wave Hill House, Bronx, NY

        Nassau County Community College

        MASONRY FACADE RESTORATION / PLAZA DECK REPLACEMENT

        Borough Of Manhattan Community College

        PLAZA RAMP UPGRADE


        BORO OF MANHATTAN COMMUNITY PLAZA RAMP UPGRADE - Project # MC138-098

          MS 217

          MANHATTAN AUDITORIUM UPGRADE

          MS 217 Manhattan Auditorium Upgrade

            Brooklyn Latin High School

            PHASE II – SCIENCE LAB

            BROOKLYN LATIN HS PHASE II – SCIENCE LAB

              NYC School Construction Authority

              Temporary Classroom Unit III

              Days to complete: 77 This two classroom, two bathroom 1,344 SF facility was designed and engineering to be the prototype modular classroom building for the entire NYC School System. The buildings design and specifications were approved by the NYC SCA and FID after a rigorous review and submittal process. Lo Sardo General Contractors Inc was awarded a 5 year contract to furnish these units throughout the five boroughs of the NYC School System.
              Lo Sardo has delivered 14 of these TCU’s to date in both stand alone and back to back configuration as shown. Units were designed to provide additional classroom space for existing schools or to be clustered together to form stand alone schools. The open floor plan allows the SCA to convert the units to administrative space, nurses offices, etc. as needed at the different schools.
              This facility was built to meet construction group 1-E non-combustible and rigid NYC building code, including mechanical and electrical equipment MEA certification. This is but one example of the over 100 Modular installations Lo Sardo has completed successfully over the last 20 years for the New York City School Construction Authority.

              Other Project Highlights...

                TRUST YOUR CONTRACTING TO THE DEDICATED EXPERTS AT LO SARDO.

                A skilled workforce, all trades & disciplines, full project oversight by the corporate principals.

                 

                • THE CITY UNIVERSITY OF NEW YORK
                • INTERASIAN RESOURCES LTD.
                • MACKLOWE MANAGEMENT
                • NEW YORK HEALTH AND HOSPITALS
                • METROPOLITAN TRANSIT AUTHORITY
                • NYC SCHOOL CONSTRUCTION AUTHORITY
                • DORMITORY AUTHORITY OF NEW YORK STATE
                • NEW YORK STATE OFFICE OF GENERAL SERVICES

                Copyright © 2019 Lo Sardo General Contractors, INC. - All Rights Reserved.
                LO SARDO GENERAL CONTRACTORS INC. | 35 CRESCENT STREET BROOKLYN, NY 11208 |
                TELEPHONE: 718.647.4924 | FAX: 718.647.752